Production Planning Solver

Turn live ops data into an executable 8-week plan.

The planner reads products, materials, bills of materials, inventory, sales velocity, scheduled work, and open supplier orders; then a constraint optimizer chooses what to make, ship, and buy.

~5 minhealthy production solve
0 gapsmaterial feasibility target
12 weeksinternal look-ahead
Sales demand by channel Inventory + materials Open work + supplier orders Constraint optimizer 12-week look-ahead Make plan Manufacturing Ship plan Fulfillment Buy plan Procurement velocity, safety, lead time stock, recipes, alternates locked near-term schedule service, capacity, cash what to produce what to replenish what to order

Typical solver load

Averages from 59 recent healthy planning runs; hero values from the June 8 production planning run.
Products
773
average active finished-product catalog; June 8 run loaded 784.
Materials
1,215
average raw, packaging, and component catalog; June 8 run loaded 1,236.
Material recipes
2,822
average product-to-material relationships; June 8 run loaded 2,879.
Solver terms
51.7k
average optimization terms; the June 8 production run had 51,536.

What goes in

The planner uses operational tables, not a spreadsheet approximation.

Input domains

Finished products Material inventory Bills of materials Sales velocity Marketplace channels Open supplier orders Scheduled production Scheduled shipments Supplier lead times Minimum buys and costs Safety-stock rules Capacity bands

Planning phases

1
LoadClean product, material, inventory, order, shipment, and schedule records.
2
ForecastProject channel stock against velocity, safety days, and lead time.
3
BatchGroup products into manufacturing families and production cycles.
4
SolveSelect feasible production, shipment, and supplier-order recommendations.
5
PublishPush plans and health checks to operating tables.

Solving mechanism

Production path is a Google OR-Tools CP-SAT constraint solver; heuristic mode is fallback/debug only.
Constraint solver OR-Tools CP-SAT Hard constraints materials cannot go negative scheduled work is preserved Service objective protect stockout-risk channels first Capacity shape keep production in a stable weekly band Cash discipline time supplier orders against material need

June 8 production solve

StatusFEASIBLE
Solve time301s
Material infeasibility0
Capacity overflow0
Optimization terms51,536
Optimality gap0.0%

What comes out of every run

June 8 feasible production run; 8 visible weeks, 12-week internal planning horizon.
Production planWhich products to make, in which week, in which manufacturing family.
86 production rows
Shipment planCustomer-channel replenishments with the inventory or production source.
128 shipment rows
Procurement planSupplier orders with issue week, arrival week, minimum buy, and cash timing.
77 supplier-order rows
Material readinessPer-production-order checks: ready, short, substituted, or scheduled-work warning.
481 readiness rows
Material flow ledgerWeek-by-week material balance and shortage-driver attribution.
5,904 ledger rows
Projection + health reportsInventory projections, quality checks, exception reports, and visibility audits.
6,048 product-week projection rows

Published planning outputs

The run publishes validated planning records and audit views to the operating database with clear failure reporting.
Shipment planCreates, updates, cancels, and links fulfillment recommendations.
Production scheduleCreates planned production and preserves locked scheduled work.
Supplier-order forecastCreates planned buys and cancels stale planner-owned recommendations.
Material flow ledgerWrites the full material-week snapshot for operators.
Material readinessShows component readiness for each production order.
Product inventory projectionShows channel inventory, days-on-hand status, and below-safety flags.
Cash scheduleTurns supplier-order timing into cash-plan visibility.
Alerts + plan healthStockout alerts, weekly quality checks, and exception reports.

Why this matters commercially

The system converts planner judgment into repeatable controls.
Planned production units over horizon49,919
Planned shipment units over horizon49,768
Planned supplier-order value$272k
Cash visible in horizon$188k

Weekly production profile: first 8 weeks

W1
1.4k
W2
2.6k
W3
9.5k
W4
8.0k
W5
8.0k
W6
3.2k
W7
8.9k
W8
6.9k